704-841-2001
Backed with a massive machinery database considered to be “the blue book” of woodworking machinery), EX-FACTORY Auctions provides a complete assessment of your equipment and allows you to interact with the market real-time in our dynamic Online Auction!
Industry
Sawmill
Category
Boilers
5 Results Found
704-841-2001
$495,000
BARKER Boiler and Fuel System built & tested in 2011 as a pilot unit. Successful testing has been completed. This surplus equipment includes the following main features: -- Combustion Temp Capability- 2,000 deg.F.; Steam Flow 24,000 lbs/hr saturated; Steam Pressure 1,500 PSI @ 600 deg. F. -- Fuel Feed rate - 3,000 Lbs/hr at 1/4" biomass (5% moisture) -- Heat Input - 7,500 btu/Lbs HHV @ 22 mmbtu/hr. -- All equipment has less than 2,500 actual operating hours since installation.EQUIPMENT MAJOR COMPONENTS: Combustor, Cyclonic combustion technology, Refractory lined Heat Recovery. Steam Generator. Rotary Drum Dryer for Fuel drying - capable of 30% moisture reduction (at the above combustion parameters) and 1.5 tons per hour (installed as used equipment).BALANCE OF PLANT FUEL FEED SYSTEM: Live-bottom bin, Bunker, Feed conveyors, Wood hog, Vibrating screen, Drag and screw conveyors. Boiler water system - feed pump,water and steam piping Emissions Control: All required baghouses (SJVUAPCD) California permitted. -- Now REDUCED PRICE from $1.5 million !!
$425,000
Wood-Fired BOILERSMITH Boiler fitted with CHALLENGER Cumbustion Unit;Complete with the following major components and features: -- 250 PSIG design pressure. -- BOILERSMITH Boiler Model HRT2H8-2600SF-XW-250 with 2600 Sq. Ft. boiler surface area. -- Fuel can vary in moisture up to 50%. (Boiler HP is reduced as moisture increases.) -- Fuel feed Auger with Variable Frequency Drive. -- Fire-Tube Boiler with integrated Air Blast Tube Cleaning. -- De-Ash Augers. -- All Electrical Controls and starters. -- All mechanical/ electircal engineer's drawings.NOTES: ● Removed and ready to load onto two trucks, 38,000 and 42,000 pounds. ● 15,000 to 16,000 pounds per hour steam if burning wood pellets. ● No building included but same building can be purchased from STAR.
$35,000
BRYAN - CL 240-W-GI, ...Hot Water Tube BoilerThis Boiler was taken out of an Office Furniture Factory where it was used to heat drying tunnels to a temp of 120 F.Disconnected and in storage for 1-1/2 years.Details & Specifications:Model: CL240-W-GIInput MBH: 2,160/1,080Output MBH: 1,728BRYAN #: 971292Relief Valve Setting: 50 PSIGHeating Surface: 287 sq/ftMAWP Water: 60 PSIGNational Bond #: 41033Canadian Reg #: E6190.25Gas Data:Natural GasMax Input CFH: 2,160Min. Input CFH: 1,080Min. supply Pressure: 7 In. WCMax supply pressure: 14 In. WCManifold pressure in WC: 3.5Orifice size: DMS 29
Call for Price
Plant Boiler System for up to 60,000 pounds of steam production per hour (1790 HP) with the following features and main components: -- (2) ENGLISH BOILER AND TUBE, INC. Boilers each rated for 20,700 pounds of steam per hour each. However, manufacturer specified they can be operated at 30,000 pounds per hour with dry wood or bark fuel (12 percent moisture). -- 250 PSI operating pressure ratings on each Boiler. -- VFD Drives on all main Motors. (The plant uses a maximum 75 HP for each boiler.) -- Electrical Controls. -- (1) Boiler has an Oil Burner for operating optionally on oil if sawdust or wood chips is not available. -- Chemical Water Conditioning System and Pumping System. -- De-aerator and Condensate Tank. -- Multi-clones for particle emissions reduction and abatement. -- (2) Fuel Storage Silos (25’x40’ & 20’x38’) with LAIDIG Model 243 Track-Driven Unloaders. -- Fuel Transfer Conveyors. -- The Silos also are included at the price shown and are available individually. See our listings DB-010162 and DB-010163 for details and individual pricing. -- Boilers can be purchased individually or as a pair. -- Professional removal and installation services are available.
$550,000
HURST 600 HP Waste Fired Boiler; -- Specifications:Complete in-place system with the following features: -- Decommissioned July 2019. -- 150 PSI. (300 PSI max wp), -- 20,700 Lbs per hour. -- Fuel House, Boiler Building and all Controls -- System has been "pickled" to maintain tube integrity.